improvements to SH-66 bridge over bird creek, near catoosa, Oklahoma
Project Background
- November 10, 2022 (posted). Section 106 Consultation
- October 1, 2021 (posted). Meeting Minutes from September 20, 2021 meeting.
- September 20, 2021 Section 106 consulting party meeting. This link takes you to the video recording of the consulting party meeting.
- Presentation. This link opens the consulting party meeting presentation.
- Design Analysis (May 2022). This document represents the engineering report and includes an existing conditions analysis and discussion of the alternatives that must be considered under Section 4(f).
- **This document was initially completed in September 2021, but was updated in May 2022 to reflect a March 2022 bridge inspection.
- Section 106 Initiation letter to consulting parties - November 11, 2019